{"id":25539,"date":"2026-11-06T17:45:18","date_gmt":"2026-11-06T17:45:18","guid":{"rendered":"https:\/\/www.insurancejournal.com\/?p=891870"},"modified":"2026-11-06T17:45:18","modified_gmt":"2026-11-06T17:45:18","slug":"some-40-of-us-planned-data-center-capacity-is-in-states-wanting-to-hit-pause","status":"publish","type":"post","link":"https:\/\/blog.lifeinsurance-orleans.ca\/index.php\/2026\/11\/06\/some-40-of-us-planned-data-center-capacity-is-in-states-wanting-to-hit-pause\/","title":{"rendered":"Some 40% of US Planned Data Center Capacity Is in States Wanting to Hit Pause"},"content":{"rendered":"<p><img decoding=\"async\" src=\"https:\/\/www.insurancejournal.com\/app\/uploads\/2026\/11\/Ban-Data-Centers-Sign-580x387.jpg\"><\/p>\n<ul class=\"nav nav-tabs tabs tabs-entry\">\n<li class=\"active\"><a href=\"https:\/\/www.insurancejournal.com\/news\/southcentral\/2026\/11\/06\/891870.htm\">Article<\/a><\/li>\n<li><a href=\"https:\/\/www.insurancejournal.com\/news\/southcentral\/2026\/11\/06\/891870.htm?comments\" rel=\"nofollow\">0 Comments<\/a><\/li>\n<\/ul>\n<div class=\"article-content clearfix\">\n<p class=\"bloomberg\">Data center opposition had been building across the country, one moratorium or blocked project at a time. Then, virtually overnight, the midterm election tilted a broad swath of the regulatory map against the AI buildout.<\/p>\n<p>Newly elected governors in Ohio, Georgia, Michigan, New Mexico and Texas campaigned on a promise to stop \u2014 or at least pause \u2014 data center construction statewide, while those in New York and Oregon pledged to prolong pauses already in place. Gubernatorial candidates calling for a moratorium on data centers also lead in Alaska and Kansas, though those races have not been called.<\/p>\n<div class=\"bzn bzn-sized bzn-intext\">\n<ins data-revive-zoneid=\"79\" data-revive-block=\"1\" data-revive-id=\"36eb7c2bd3daa932a43cc2a8ffbed3a9\"><\/ins> <\/div>\n<p>All told, about 40% of pending data center capacity in the US is planned to be built in states where newly elected governors have promised to stop or pause such construction, according to data from Cleanview, a market intelligence company. That\u2019s on top of 46 local ballot measures approved or on track to pass that also stall development, according to Bloomberg Economics; at least 17 of those are outright bans on large-scale data centers.<\/p>\n<p>\u201cIt was obviously not a very good night if you\u2019re a data center developer,\u201d said Justin Teresi, a Bloomberg Intelligence policy analyst.<\/p>\n<p><a href=\"https:\/\/www.insurancejournal.com\/app\/uploads\/2026\/11\/Midterm-Election-Data-Centers.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-large wp-image-891874\" src=\"https:\/\/www.insurancejournal.com\/app\/uploads\/2026\/11\/Midterm-Election-Data-Centers-580x556.jpg\" alt width=\"580\" height=\"556\" srcset=\"https:\/\/www.insurancejournal.com\/app\/uploads\/2026\/11\/Midterm-Election-Data-Centers-580x556.jpg 580w, https:\/\/www.insurancejournal.com\/app\/uploads\/2026\/11\/Midterm-Election-Data-Centers-300x287.jpg 300w, https:\/\/www.insurancejournal.com\/app\/uploads\/2026\/11\/Midterm-Election-Data-Centers-768x736.jpg 768w, https:\/\/www.insurancejournal.com\/app\/uploads\/2026\/11\/Midterm-Election-Data-Centers-1536x1471.jpg 1536w, https:\/\/www.insurancejournal.com\/app\/uploads\/2026\/11\/Midterm-Election-Data-Centers.jpg 1776w\" sizes=\"auto, (max-width: 580px) 100vw, 580px\"><\/a><\/p>\n<p>The political victories underscore the growing <a href=\"https:\/\/www.bloomberg.com\/news\/articles\/2026-11-04\/ai-data-center-boom-is-set-for-upheaval-after-us-election-rout\" target=\"_blank\" rel=\"noopener noreferrer\">voter backlash<\/a> against the massive industrial warehouses crunching ChatGPT and Claude queries. The potential moratoriums threaten development plans for a host of tech giants frantically trying to build more of that computing capacity.<\/p>\n<p>Investors braced for the fallout. Tech stocks plummeted Thursday in expectation of tighter regulation, with the S&amp;P 500 Index dropping more than 4% and the technology-centric Nasdaq 100 falling 6.4%, erasing $2.3 trillion in market value.<\/p>\n<p>Since 2022, when OpenAI publicly released ChatGPT, technology stocks have fueled a bull run in US equities, with the S&amp;P 500 more than doubling in the four-year period through Wednesday\u2019s close. Technology now accounts for more than half the value of the benchmark index.<\/p>\n<div class=\"bzn bzn-sized bzn-intext-2\">\n<ins data-revive-zoneid=\"162\" data-revive-block=\"1\" data-revive-id=\"36eb7c2bd3daa932a43cc2a8ffbed3a9\"><\/ins> <\/div>\n<p>The election results are adding to the pressure AI data center developers and their customers were already facing as investors and lenders grow wary of the <a href=\"https:\/\/www.bloomberg.com\/news\/articles\/2026-10-23\/ai-tech-fears-push-global-credit-spreads-to-17-month-high?leadSource=uverify%20wall\" target=\"_blank\" rel=\"noopener noreferrer\">heavy borrowing<\/a> and the hundreds of billions of dollars being poured into the boom.<\/p>\n<p>Local opposition efforts, meanwhile, had already hampered at least<a href=\"https:\/\/www.datacenterwatch.org\/q2-2026\" target=\"_blank\" rel=\"noopener noreferrer\"> 45 projects<\/a> in the second quarter of 2026, according to Data Center Watch, a research group.<\/p>\n<figure id=\"attachment_891875\" aria-describedby=\"caption-attachment-891875\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.insurancejournal.com\/app\/uploads\/2026\/11\/Data-Center-Protests-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-891875\" src=\"https:\/\/www.insurancejournal.com\/app\/uploads\/2026\/11\/Data-Center-Protests-580x387.jpg\" alt width=\"580\" height=\"387\" srcset=\"https:\/\/www.insurancejournal.com\/app\/uploads\/2026\/11\/Data-Center-Protests-580x387.jpg 580w, https:\/\/www.insurancejournal.com\/app\/uploads\/2026\/11\/Data-Center-Protests-300x200.jpg 300w, https:\/\/www.insurancejournal.com\/app\/uploads\/2026\/11\/Data-Center-Protests-768x512.jpg 768w, https:\/\/www.insurancejournal.com\/app\/uploads\/2026\/11\/Data-Center-Protests-1536x1024.jpg 1536w, https:\/\/www.insurancejournal.com\/app\/uploads\/2026\/11\/Data-Center-Protests-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 580px) 100vw, 580px\"><\/a><figcaption id=\"caption-attachment-891875\" class=\"wp-caption-text\">Demonstrators during the first day of early voting for the midterm election in Peekskill, New York, on Oct. 24. Photographer: Adam Gray\/Bloomberg<\/figcaption><\/figure>\n<p>Though data center oversight has become an increasingly bipartisan issue, this week\u2019s blue wave election means much of the tough campaign talk on AI might be reflected in state policy. Democrats now control key branches of state government in some of the country\u2019s data center hotbeds, including Virginia, Pennsylvania and Arizona, and are likely to pursue utility and permitting policies that stall construction, according to a <a href=\"https:\/\/www.bnef.com\/analyst-reactions\/tnzj1ckjh6v500\" target=\"_blank\" rel=\"noopener noreferrer\">new report<\/a> from BloombergNEF.<\/p>\n<p>Dan Diorio, executive vice president of state policy and government affairs for the Data Center Coalition, an industry alliance, said communities that prohibit data centers risk seeing investment, jobs and tax revenue move elsewhere.<\/p>\n<p>\u201cThat\u2019s going to go to other communities that have not shut themselves off,\u201d Diorio said, \u201cor to states that have not shut themselves off.\u201d<\/p>\n<p>Hyperscalers, the largest cloud-computing providers, are expected to overhaul and shift development plans in response. Tuesday\u2019s results stand to shrink the $1.4 trillion that technology companies were expected to spend on AI infrastructure by roughly 5% to 7% in 2027, according to Bloomberg Intelligence technology analyst Mandeep Singh. That includes spending on chips, networking equipment, land and other materials for data center construction.<\/p>\n<p>Those cuts and the anticipated slowdown in approvals may translate into as many as 10 gigawatts of data center capacity failing to come online next year as planned, Singh said.<\/p>\n<p>\u201cWe\u2019ve gone from the question of who is going to pass a moratorium to where can I even construct one of these things now?\u201d Teresi, also with Bloomberg Intelligence, said.<\/p>\n<p>Gordon Johnson of GLJ Research said in a note late Tuesday that Texas data center projects that don\u2019t already have electricity and environmental permits lined up will \u201cprobably go to Louisiana, Oklahoma or nowhere.\u201d<\/p>\n<p>From a political perspective, candidate promises to freeze the AI build-out appeared to be a no-brainer. Nearly three in four Americans now oppose a data center in their community, up from about two-thirds in March, according to a September Quinnipiac poll. An October poll from Ohio Northern University <a href=\"https:\/\/www.onu.edu\/northern-poll\" target=\"_blank\" rel=\"noopener noreferrer\">found that 57% of respondents<\/a> in the state would vote \u201cyes\u201d on a total ban on large-scale data centers.<\/p>\n<p>Nearly half of the country\u2019s 46 ballot measures to restrict data center construction were in Ohio and nearly all of them passed easily. Some rejected specific projects, such as EdgeConneX\u2019s complex in Ashville, or <a href=\"https:\/\/www.vox.com\/future-perfect\/509247\/ohio-data-centers-ai-election-perry-tax-breaks\" target=\"_blank\" rel=\"noopener noreferrer\">required financial guarantees<\/a>, while others set limits on data center power and water use; some 11 Ohio towns passed total or near-bans.<\/p>\n<p>The state has been \u201cthe Wild West\u201d of data center construction, said David Niven, a political scientist at the University of Cincinnati. Thanks to relatively cheap land and sales tax exemptions extending for decades, Ohio already has about 200 data centers, the fifth-most in the country.<\/p>\n<p>\u201cThe practical consequences of the backlash really only took off within the last few months,\u201d said Niven. \u201cData centers played a key part in the sort of general dissatisfaction that Ohio voters felt.\u201d<\/p>\n<p>Local ballot measures will have a more direct and immediate effect than any gubernatorial action, as cities and townships control zoning and property taxes, said Joshua Basseches, an energy public policy expert at Case Western Reserve University in Cleveland.<\/p>\n<p>Still, once Ohio Governor-elect Amy Acton takes office in January, she can issue executive orders halting state data center permitting, or dial up scrutiny over their operations through her appointments to key state agencies, such as the public utilities commission. Ahead of the election, Acton\u2019s stump mantra was: \u201cOhio is open for business, but we are not up for sale.\u201d<\/p>\n<p>More permanent changes, such as extending the temporary <a href=\"http:\/\/google.com\/url?q=https:\/\/www.bloomberg.com\/news\/articles\/2026-05-27\/ohio-to-halt-data-center-tax-credits-as-opposition-grows&amp;sa=D&amp;source=docs&amp;ust=1793910894707451&amp;usg=AOvVaw1Td5ICYrVeegsDsnCfNkye\" target=\"_blank\" rel=\"noopener noreferrer\">tax credit freeze<\/a> rolled out by her predecessor, would require legislative buy-in.<\/p>\n<p>Even if states don\u2019t impose outright moratoriums or bans, the landscape for hyperscalers looks increasingly hostile given state and local power over many land-use decisions.<\/p>\n<figure id=\"attachment_891877\" aria-describedby=\"caption-attachment-891877\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.insurancejournal.com\/app\/uploads\/2026\/11\/North-Carolina-Governor-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-891877\" src=\"https:\/\/www.insurancejournal.com\/app\/uploads\/2026\/11\/North-Carolina-Governor-580x408.jpg\" alt width=\"580\" height=\"408\" srcset=\"https:\/\/www.insurancejournal.com\/app\/uploads\/2026\/11\/North-Carolina-Governor-580x408.jpg 580w, https:\/\/www.insurancejournal.com\/app\/uploads\/2026\/11\/North-Carolina-Governor-300x211.jpg 300w, https:\/\/www.insurancejournal.com\/app\/uploads\/2026\/11\/North-Carolina-Governor-768x540.jpg 768w, https:\/\/www.insurancejournal.com\/app\/uploads\/2026\/11\/North-Carolina-Governor-1536x1079.jpg 1536w, https:\/\/www.insurancejournal.com\/app\/uploads\/2026\/11\/North-Carolina-Governor-2048x1439.jpg 2048w\" sizes=\"auto, (max-width: 580px) 100vw, 580px\"><\/a><figcaption id=\"caption-attachment-891877\" class=\"wp-caption-text\">Amy Acton at a midterm election night watch party in Columbus, Ohio, on Nov. 3. Photographer: Jeff Swensen\/Getty Images<\/figcaption><\/figure>\n<figure><picture><source srcset=\"https:\/\/assets.bwbx.io\/images\/users\/iqjWHBFdfxIU\/iaNcd5xUaN9U\/v1\/piNvaTs1gp8202qz_dewi2PvPDETo3MkHBrbPW_GR81uzDParBy7STNsGox.ps98SbSu48UitGf0c\/814x-1.jpg\" media=\"(min-width: 769px)\"><source srcset=\"https:\/\/assets.bwbx.io\/images\/users\/iqjWHBFdfxIU\/iaNcd5xUaN9U\/v1\/piNvaTs1gp8202qz_dewi2PvPDETo3MkHBrbPW_GR81uzDParBy7STNsGox.ps98SbSu48UitGf0c\/300x-1.jpg\" media=\"(min-width: 600px)\"><source srcset=\"https:\/\/assets.bwbx.io\/images\/users\/iqjWHBFdfxIU\/iaNcd5xUaN9U\/v1\/piNvaTs1gp8202qz_dewi2PvPDETo3MkHBrbPW_GR81uzDParBy7STNsGox.ps98SbSu48UitGf0c\/300x-1.jpg\"><\/picture><\/figure>\n<p>\u201cWe expect to see a lot more sand in the gears of the AI build-out regardless \u2014 with more time required to secure permits and other approvals, as well as more concessions that data center developers will have to make,\u201d said Libby Cantrill, PIMCO\u2019s head of public policy.<\/p>\n<p>Incoming governors in Iowa and Nevada pledged to stop AI tax breaks. Byron Donalds, the next governor of Florida, has promised a measure that would require data centers to source their own electricity, rather than plugging into the grid.<\/p>\n<p>Politicians who once championed the artificial intelligence expansion veered to more critical stances in the final stretch of the recent election. Republican Vivek Ramaswamy, Acton\u2019s challenger in Ohio, floated a plan that would require data centers to provide free electricity for nearby residents.<\/p>\n<p>\u201cIf one gubernatorial candidate went further, the other would follow,\u201d said Morgan Scarboro, vice president at MultiState, a state and local government consulting firm. \u201cThis is an issue where it\u2019s very difficult to just look at a quote and know which party is speaking.\u201d<\/p>\n<p><a href=\"https:\/\/www.insurancejournal.com\/app\/uploads\/2026\/11\/Data-Center-Scrutiny.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-large wp-image-891878\" src=\"https:\/\/www.insurancejournal.com\/app\/uploads\/2026\/11\/Data-Center-Scrutiny-580x390.jpg\" alt width=\"580\" height=\"390\" srcset=\"https:\/\/www.insurancejournal.com\/app\/uploads\/2026\/11\/Data-Center-Scrutiny-580x390.jpg 580w, https:\/\/www.insurancejournal.com\/app\/uploads\/2026\/11\/Data-Center-Scrutiny-300x201.jpg 300w, https:\/\/www.insurancejournal.com\/app\/uploads\/2026\/11\/Data-Center-Scrutiny-768x516.jpg 768w, https:\/\/www.insurancejournal.com\/app\/uploads\/2026\/11\/Data-Center-Scrutiny-1536x1032.jpg 1536w, https:\/\/www.insurancejournal.com\/app\/uploads\/2026\/11\/Data-Center-Scrutiny.jpg 2010w\" sizes=\"auto, (max-width: 580px) 100vw, 580px\"><\/a><\/p>\n<p>Sarah Adkisson, an attorney at business advisory firm EisnerAmper, said governments may shift toward a \u201cprove it first, then you get\u201d model, awarding tax breaks after developers deliver on jobs, investment or revenue.<\/p>\n<p>Even before the election, tech companies were already coming up with strategies to improve relations in the communities where they wanted to build. <a href=\"https:\/\/www.bloomberg.com\/quote\/2611033D:US\" target=\"_blank\" rel=\"noopener noreferrer\">OpenAI,<\/a> for example, said Thursday it will avoid nondisclosure agreements when it negotiates data center deals and ensure residents don\u2019t pay for the electricity to power those projects.<\/p>\n<div class=\"copyright-notice quiet\">Copyright 2026 Bloomberg.<\/div>\n<p class=\"tagtag\"> <span class=\"tagtag\">Topics<\/span> <a href=\"https:\/\/www.insurancejournal.com\/location\/usa\/\" class=\"btn btn-sm btn-primary tagtag\">USA<\/a> <\/p>\n<\/p><\/div>\n<div class=\"article-poll\" data-post=\"891870\">\n<div class=\"article-poll-vote\">\n<p>Was this article valuable?<\/p>\n<\/p><\/div>\n<div class=\"article-poll-feedback voted-no\">\n<form class=\"feedback-form\">\n<p>Thank you! Please tell us what we can do to improve this article.<\/p>\n<p> <textarea placeholder=\"Enter your feedback...\"><\/textarea> <button type=\"submit\" class=\"submit\" disabled>Submit<\/button> <button class=\"cancel\">No Thanks<\/button> <\/form>\n<\/p><\/div>\n<div class=\"article-poll-feedback voted-yes\">\n<form class=\"feedback-form\">\n<p>Thank you! <span class=\"percent\"><\/span>% of people found this article valuable. Please tell us what you liked about it.<\/p>\n<p> <textarea placeholder=\"Enter your feedback...\"><\/textarea> <button type=\"submit\" class=\"submit\" disabled>Submit<\/button> <button class=\"cancel\">No Thanks<\/button> <\/form>\n<\/p><\/div>\n<div class=\"article-poll-more-articles\">\n<p class=\"thank-you-text\">Here are more articles you may enjoy.<\/p>\n<\/p><\/div>\n<\/p><\/div>\n<div class=\"subscribe-banner subscribe-banner-in-content-2\">\n<div class=\"content\">\n<h4>The most important insurance news,in your inbox every business day.<\/h4>\n<p>Get the insurance industry&#8217;s trusted newsletter<\/p>\n<\/p><\/div>\n<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Article 0 Comments Data center opposition had been building across the country, one moratorium or blocked project at a time. Then, virtually overnight, the midterm election tilted a broad swath of the regulatory map&#46;&#46;&#46;<\/p>\n","protected":false},"author":1,"featured_media":25540,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[],"tags":[13,1,77],"class_list":["post-25539","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","tag-midwest-news","tag-news","tag-texas-south-central-news"],"jetpack_featured_media_url":"https:\/\/blog.lifeinsurance-orleans.ca\/wp-content\/uploads\/2026\/11\/some-40-of-us-planned-data-center-capacity-is-in-states-wanting-to-hit-pause.jpg","_links":{"self":[{"href":"https:\/\/blog.lifeinsurance-orleans.ca\/index.php\/wp-json\/wp\/v2\/posts\/25539","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blog.lifeinsurance-orleans.ca\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blog.lifeinsurance-orleans.ca\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blog.lifeinsurance-orleans.ca\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/blog.lifeinsurance-orleans.ca\/index.php\/wp-json\/wp\/v2\/comments?post=25539"}],"version-history":[{"count":0,"href":"https:\/\/blog.lifeinsurance-orleans.ca\/index.php\/wp-json\/wp\/v2\/posts\/25539\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blog.lifeinsurance-orleans.ca\/index.php\/wp-json\/wp\/v2\/media\/25540"}],"wp:attachment":[{"href":"https:\/\/blog.lifeinsurance-orleans.ca\/index.php\/wp-json\/wp\/v2\/media?parent=25539"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blog.lifeinsurance-orleans.ca\/index.php\/wp-json\/wp\/v2\/categories?post=25539"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blog.lifeinsurance-orleans.ca\/index.php\/wp-json\/wp\/v2\/tags?post=25539"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}